Belgrade dining room addition

Dining Room Addition Belgrade

February, 2017

This is a residential dining room addition that we built in Belgrade, Montana. We managed all aspects of the project - from excavation and concrete to the final interior and exterior finishes.


  • concrete forms

    Forms are set and Mundt Construction is ready to pour the walls for the addition.

  • concrete boom truck lift

    The concrete boom truck gets ready to pour the foundation walls.

  • concrete boom truck lift

    The boom truck reaches over the house to pour concrete for the back yard addition.

  • concrete footings

    The new crawl space is insulated and a vapor barrier is installed.

  • rough framing and trusses

    Rough framing is complete, the building is dried-in and Nano Electrical is working on the rough-in for can lights.

  • decking rough frame

    Rough framing for new steps and landing to exit the back door of the addition.

  • Deck and stair framing

    A landing for a second back door exit is rough framed and decked.