Detached garage on adams street in three forks

July, 2015

We built this two garage on Adams Street in the summer of 2015. The finished building is sided and roofed to match the existing home.

 


  • A concrete pump truck gets ready to pour the garage footings.

  • James, Steve and Tyler work on the rough framing of the walls.

  • Looking up from the inside of the garage after the trusses are set.

  • Rough framing for the garage walls.